nyc dot traffic standard drawings

WORK IN ACCORDANCE WITH OCMC STIP SHEET AND ALL VALID AMENDMENTS WHICH MUST BE ATTACHED TO THIS PERMIT AND ON SITE. WORK 9 PM TO 6 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH TO TRAFFIC WHEN SITE IS UNATTENDED. BEFORE WORK, MUST COORDINATE AND OBTAIN APPROVAL FROM NYSDOT 9A EIC. Long Island City, NY 11101 After repairs are complete, the property owner can contact 311 to schedule a Sidewalk Violation Dismissal. MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING CENTER MALL. The NYC Street Works Manual describes policies governing work on city streets, and presents procedures for notice, approval and execution of such work. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. The Third Edition of the Street Design Manual renews the Manuals status as a living document and reinforces its role as a critical resource for those working on projects in New York Citys public right-of-way. IF RENEWED OR REISSUED, THIS PERMIT SHALL NOT BE PLACED ON HOLD. Name, address and phone number of excavator, Brief description of the planned digging and excavation. The permittee may apply for a renewal online, or in-person by accessing either theApplication to Renew Permitsor theApplication to Renew Governmental Permit(s). FULL WIDTH OF SIDEWALK AND ROADWAY MUST BE RESTORED AFTER WORKING HOURS. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. This requires a minimum distance on narrow sidewalks (10-12 feet Secondary Streets) of 5 ft., or a minimum distance on wide sidewalks (Larger than 12 feet Main Streets) of 8 ft. WALKWAY MUST BE RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY. AS PER STIPULATION MEC04-246 AND PROJECT PLANS DATED 04/30/04 WHICH MUST BE ATTACHED TO PERMIT. In addition to the application procedures for the four categories of permit types, there are some situations or street conditions that require special procedures. This form cannot be used if the permit has already expired. If the applicant does not agree with the PM, he or she is informed of the appeals process. The first and most expeditious option (see Diagram 2), is by using the DOT on-line NYCStreets Permit Management system. MAINTAIN 5 FOOT PED. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 204 PERMIT TO MAINTAIN THE FENCE & AN ACTIVE TYPE 215 PERMIT. Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications. AT REQUEST OF DEP LETTER DATED 6/16/05 WITH C.B. Any definitions found in existing federal, state or city laws, rules and regulations take precedence as the official and legal definitions. The fee for reissuance may be found in Section 2-03 of the Highway Rules. If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply. If a private homeowner is applying for a Sidewalk Repair Permit, and will be making the repair by himself/herself, the homeowner may apply for a permit by mail. SPECIAL PROCEDURES TO FOLLOW WHEN RESTORING TRENCHES IN RECENTLY PROTECTED RECONSTRUCTED ROADWAYS: 1. An Occupancy of Sidewalk Permit is required when either more than 3 feet from the property line is obstructed by a fence or a minimum of 5 feet of clear path cannot be maintained for pedestrians, or as otherwise stipulated. At the foundation of the city that never sleeps lays a network of streets that helps keep New York and New Yorkers moving forward. As shown in the screen image, the pop-up for the "NYC DOT 10 year Capital Plan" layer features a project ID, title, and the fiscal year for which the project is planned, whereas the pop-up for "NYC DOT Protected Streets" includes street name and the date to which protected status extends. View the most recent version of Drawing #H1029 of the NYC DOT. 3. MAINTAIN A 5 FOOT CLEAR PEDESTRIAN WALKWAY IN ROADWAY. The Office of Construction Mitigation and Coordination (OCMC) reviews all construction permit applications and develops construction activity, Completed Permittee Registration Application. In order to apply for a permit, an applicant must first register in person with NYC DOT by submitting a completed Permittee Registration Application. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . FULL INTERSECTION RESTORATION WILL BE REQUIRED WHEN MORE THAN 50% OF THE INTERSECTION IS EXCAVATED. When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. It is essential to call New York 811 before digging anywhere, including sidewalks and soil. (If the homeowner is using a contractor, the contractor must be registered with NYC DOT and must take out the permit.) Prior to any permit revocation, NYC DOT will give the permittee an opportunity to be heard with not less than two days' notice. THIS STIP IS USED FOR WORK CROSSING THE ROADWAY OR FOR BPP RESTORATIONS THAT FALL OUTSIDE OF THE HALF PLUS FIVE RULE. A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. If repairs have not been made within the 75 day period, the City may make the repairs and bill the property owner for the cost of the repairs. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR 12"BEYOND FURTHEST CUT TO CURB LINE FOR ALL CUTS AS AGREED TO W ITH THE BOROUGH ASHO'S OFFICE. These forms may also be found inAppendix B, Forms. Office hours: 8:30 AM-5:00 PM, Manhattan Permit Management & Construction Control Permit by Mail Permeable Interlocking Concrete Paver (PICP). Brooklyn New York 811 then relays digging and excavation requests to its member network of utility companies and underground facility owners, who are required to mark the location of their underground facilities within two working days. OF BRIDGES: UPON INITIAL INSTALLATION OF A CANOPY, THE PERMIT TO MAINTAIN A CANOPY SHALL BE PLACED ON HOLD UNTIL A FINAL INSPECTION DETERMINES CANOPY WAS INSTALLED AS PER SUBMITTED PLANS. The Poles and Luminaires chart identifies which combinations of poles and luminaires are permitted. If it is determined to be unfeasible, the pending permit will be rejected. PARKING OF NON COMMERCIAL VEHICLES ON THE ROADWAY, SIDEWALK OR WITHIN THE WORK ZONE IS PROHIBITED. Office hours: 8:30 AM-5:00 PM, Brooklyn PERMITTEE MAY OCCUPY CURB LANE 24/7 FROM 10/4 THROUGH OCTOBER 10/15/2010. Tel: (718) 482-4516 PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT RED LIGHT CAMERA UNIT TO OBTAIN THE CONSTRUCTION AND MARKINGS PLANS FOR THIS WORK AREA. Further information on responding to CARs may be found in the Highway Rules, Section 2-02(d). Sidewalk GradesUnless granted a waiver from NYC DOT, permanent sidewalks must be laid to the legal curb grades. If any proposed work is within 100 feet of a bridge or structure, applicants must submit a scaled drawing showing the work and exact location. 8:30 AM to 4:30 PM, Manhattan DURING RESTORATION SAW CUTTING IS REQUIRED AS PER DRAWING H-1042A, THE PERMITTEE IS NOT PERMITTED TO ENTER, OCCUPY OR USE ANY PUBLICLY-OWNED OR PRIVATELY OWNED, NON-PAVED, LANDSCAPED OR NON-LANDSCAPED LOCATION WITHOUT SPECIFIC WRITTEN PERMISSION. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. (718) 391-1937 Brooklyn, NY 11211 AREAS WHERE THE MINIMUM CANNOT BE ACHIEVED, CONTRACTOR MUST FIRST OBTAIN WRITTEN APPROVAL FROM THE DEPARTMENT. AUTHORIZED PARKING, DIPLOMAT PARKING, BUS STOPS & TAXI ZONES ARE RESTRICTED. RESTORATION OF ROADWAY WHICH HAS RED COLORED BUS LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF TERACOTTA #103856 RIDE-A-WAY COATING MATER'L MFG'D BY INTERGRATED PAVING CONCEPTS INC OR EQUIVALENT. The applicant will be charged a fee of $30 for each utility access cover opening EAN. The latest edition is available for purchase for $50 from the Office of the Agency Chief Contracting Officer, 55 Water Street, Ground Level, New York, NY, 10041. Customer Service: (718) 286-0600, Staten Island RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. THE CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE THE FINAL RESTORATION STARTS SO THAT HIQA CAN MONITOR THE WORK. THIS PERMIT INCLUDES ALL WORK ASSOCIATED WITH THE INSTALLATION OF TREE PITS/STORM WATER CATCHMENTS. Only in circumstances where the applicant can demonstrate that the work could not have been reasonably anticipated prior to the street resurfacing/reconstruction will an application for a Street Opening Permit on a Protected Street be reviewed. An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. PERMITTEE IS REQUIRED TO OBTAIN PLAN APPROVAL FROM DOT/PERMIT MANAGEMENT ENGINEERING REVIEW AT 212-839-9666, NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT. (646) 892-1388/1389 By eliminating manual steps, most permit requests now may be approved and issued within 1-2 business days. 8:30 AM to 4:30 PM, Brooklyn OCMC will release the hold after it reviews the proposed work and adds the permit stipulations. To request a release of a SAM hold, the borough ASHO must be contacted to discuss the work and allow the ASHO to determine the extent of the restoration requirements. 210 Joralemon Street, 8th Floor PERMITTEE IS AUTHORIZED TO RESTRICT PARKING IN FRONT OF WRK ZONE & ALONG THE OPPOSITE CURB LN OF WRK ZONE USING NYPD PAPER SIGNS STATING DAY(S) OF WRK. BQE Central Workshops. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. POST SIGNS MEETING NYCDOT SPECIFICATIONS FOR DIRECTING PEDESTRIANS TO OPPOSITE SIDEWALK. ONLY FOR CORRECTIVE ACTION FOR SPECIAL EVENTS. Fax: 718-596-2609, Central Office Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. Appendix ACommon Permit Types and Documents Needed, Appendix DOther Agency and Utility Contact Information, DOB BUILDER'S PAVEMENT PLAN (BPP) AUTHORIZATION FORM, (Initial submission only) WORK 9 AM TO 7 PM SATURDAY AND 10 AM TO 7 PM SUNDAY. 8FTRES-RESTORE AS PER SKETCH #1 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. 42 Broadway Application for a canopy installation involves three major steps. The applicant will also be notified of any corrective action necessary and recourses available. 75 Park Place, 9th Floor New York City Department of Consumer Affairs (DCA) The term "street" means a public street, avenue, road, alley, lane, highway, boulevard, concourse, parkway, driveway, culvert, sidewalk, crosswalk, boardwalk, viaduct, square or place, except those streets adjacent to any waterfront property designated as a marginal street on a city map. If the applicant makes any changes to these authorized representative(s), he or she must update the Permittee Registration Application. Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. 55 Water Street, Concourse Level NYC DOT inspects sidewalks for defects and when a defect is identified, a Sidewalk Violation is issued to the property owner and a copy is submitted to the County Clerk's office. Listed in the following paragraphs are some of the requirements for canopy authorizations and permits. Common examples include approval from the New York City Department of Parks and Recreation (Parks) if any street trees or tree pits will be affected by the proposed work; a permit from the New York City Department of Environmental Protection (DEP) if any water or sewer line will be affected; and a Certificate of Appropriateness from the New York City Landmarks Preservation Commission (LPC) if the proposed work is within an Historic District. The Office of Permit Management (Permit Office) provides extensive customer support for all applicants, registers permittees, receives and reviews for accuracy and completeness permit application submitted in person,and also reviews appropriate fees for both online and in-person applications. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BUILDING LINE TO BUILDING CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. In some cases, applications and supporting documentation must be submitted in person, however the majority of permit applications may be submitted online. MAINTAIN 1 - 11 FOOT LANE FOR 2 WAY THRU TRAFFIC W/FLAGGERS AT EACH END OF WORK ZONE. Kew Gardens, NY 11424 THE VMS BOARD MUST STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF SUCH CLOSURE. Building Operations/Construction Activity Permits apply to construction activities that take place within the street and are generally associated with construction work adjacent to the street. It draws from a wide range of resources and experience to present a coherent set of choices for street design. In order to assist the goal of advanced coordination, information about planned NYC DOT projects is available via theDOTMapportal within the NYCityMapwebsite. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. A permit is required to place any construction trailer or similar structure in the street. The applicant may apply directly for this permit type without being a registered permittee, provided he or she can demonstrate proof of required insurance. Further information on responding to Orders may be found in the Highway Rules, Section 2-02(e). Workers pour cement during sidewalk reconstruction. Fax: (718) 699-7491 WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK MONDAY TO FRIDAY 10 AM-4 PM, SATURDAYAND SUNDAY, WITH NO NOISY OPERATIONS AFTER MIDNIGHT. If the location is deemed suitable, HIQA signs the Canopy Authorization Form indicating HIQA approval and returns it to the applicant. Permit Bonds, as described in the Highway Rules, Section 2-02 (a) (4), should cover all permitted activities. Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. NO NOISY OPERATIONS BETWEEN 12:01 AM AND 7:00AM. To release a POL hold, the Division of Traffic Operations, Office of Street Lighting must be contacted. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHWEST QUADRANT OF THE INTERSECTION. All links are subject to change. VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. OCCUPY 15 FEET OF E/S CURB LANE. WORK HOURS ARE NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 4 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 6 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 10 AM TO 4 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, THIS PERMIT IS VOID IF INSURANCE IS NOT RENEWED TO COVER PERIOD OF THIS PERMIT, WORK HOURS ARE EASTBOUND 10 AM TO 6 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, THE PERMITTEE IS REQUIRED TO INSTALL, MAINTAIN, AND REMOVE ALL NECESSARY TEMPORARY PARKING AND REGULATORY SIGNS AND PAVEMENT MARKINGS AND RESTORE TO THEIR ORIGINAL CONDITION PER NYCDOT STANDARDS PRIOR TO THE EXPIRATION OF THE PERMIT. Borough Hall, 2nd Floor DESIGNATED LANDMARK AREA. Tel: (718) 965-7750, Manhattan A separate Occupancy of Sidewalk Permit is required if a minimum of 5 feet cannot be maintained on the sidewalk for unobstructed pedestrian passage. ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. 8:30 AM to 4:30 PM, South Queens (south of the LIE) SOUTH CURB LANE MAY BE OCCUPIED AT ALL TIMES.FOR PUMPING OPERATION MAY ALSO TAKE THE ADJACENT LANE 7AM-4PM MONDAY TO FRIDAY WHILE MAINTAINING ONE 11 FOOT LANE FOR TRAFFIC. Bridge (BOB) hold Any planned work requiring a Building Operations/ Construction Activity Permit that may potentially be within 100 feet of a bridge structure will be placed on a Bridge hold. 47-40 21st Street New York City Department of Transportation CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. The permittee must attach a copy of the original permit to the application when it is submitted for renewal and all applicable reviews and fees will apply. Click here for a completed. ALL OCCUPANCY OF THE ROADWAY SHALL BE CONFINED TO THE PARKING LANE ONLY, WITH NO IMPACT ON THE BIKE LANE OR TRAVEL LANES AT ANY TIME. Canopies must be well-maintained at all times. Outlined below are the basic procedures in applying for a Sidewalk Repair Permit by mail: The New York City NOTARIZE THE FORM. Street work at Third Avenue and Saint Marks Place, Manhattan as part of a larger Cooper Square area reconstruction project. Typically, permits must be kept at the work site or designated field headquarters at all times and must be made available for inspection. The ASHO in each borough releases Capital Project In-House (CPI) holds and Street Arterial Maintenance (SAM) holds. Office hours: 8:30 AM-3:30 PM. WALKWAY IN ROADWAY MAY BE CLOSED 8AM- 4:30PM MON - FRI OPEN ALL OTHER TIMES. One Fordham Plaza, 5th Fl. Office hours: 8:30 AM-3:30 PM. VARIANCE GRANTED TO WORK DURING SCHOOL HOURS AS STIPULATED BY O.C.M.C. This Street Opening Permit retroactively covers the emergency street opening/excavation work already performed. View information on how to navigate and use NYCityMap. MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. 8:30 AM to 4:30 PM, Lower Manhattan (south of Canal Street) CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. New York, NY 10007-1216 For New York City Department of Design and Construction (DDC) capital projects, a CPO hold can only be released by DDC. For conditions that need immediate attention from the permittee, NYC DOT may issue Priority CARs [AKA Notices of Immediate Corrective Action (NICAs)]. Costs: Shown for each pole or luminaire as a $ symbol, representing relative costs compared to the Standard Street Light (SSL), the Octagonal Pole. Check all types of work that will be performed by the applicant or his/her corporation. These forms may also be found inAppendix B, Forms. Typical treatments include removing vault roof near curb, filling flowable lifts, and breaking vault floor. An application for a Street Opening Permit on a protected street will automatically be placed on a Street Arterial Maintenance (SAM) hold if the proposed work is to start within 18 months of the street being resurfaced or reconstructed. OCMC will review the project to determine if a Community Reassessment Impact and Amelioration (CRIA) statement must be submitted to NYC DOT. View the, Applicants must obtain all applicable original permits and/or approvals from any other governmental agencies prior to applying for a permit. THIS PERMIT INCLUDES AUTHORIZATION FOR THE STORAGE OF EQUIPMENT (OTHER THAN CRANES) AND MATERIALS ON THE JOB SITE ONLY, INCLUDING JERSEY BARRIERS IF APPLICABLE.

Bouvier Family Net Worth, Articles N

in its overall composition, the moon roughly resembles:

S

M

T

W

T

F

S


1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

August 2022


covid vaccine lump at injection site most conservative small towns in america 2021